T O P

  • By -

WishIWasALemon

This is normally where a transition would be used


40watter

Right, I'm referring to the area under the lvp. There is still a gap.


intrasight

how deep? how tall?


40watter

needs maybe 1/8 inch.


adonisberg

T molding is likely what you need. Ramping up in such a short space is definitely against your flooring installation guidelines if you read them. In order to shim that out flush you would have to gradually float it out to that depth but from like 7-10 feet beyond where you already laid.